Check out our NEW GeoMetal™ Decorative Metal Panels! Click on Products then GeoMetal™ to learn more.
September 29, 2022

 

Need to Install an Equipment Screen?

 At RoofScreen we make it easy.

Our products install above the roof deck and there is no welding required. It’s basically like a life-size LEGO build!

With watertight bases and a completely modular system, we have your equipment screening needs covered.

Check out how easy it is in the video above, or check out our Installation page!

Average time for one person to assemble: 22:20

Frame Height: 5′

Frame Span: 4′